Original Article :

Analisis risiko hydrogen recovery unit (hru) dan prioritas risiko kegagalan komponen pipa gas hidrogen di pt petrokimia

Author :

  1. Risyad Kharisma Pradana*1
  2. Endang Dwiyanti *2
  1. Mahasiswa Fakultas Kesehatan Masyarakat
  2. Dosen Fakultas Kesehatan Masyarakat

Abstract :

ABSTRACT Hydrogen Recovery Unit (HRU) is a unit which serves to purify hydrogen gas and an advanced process of Pure Gas Recovery Unit (PGRU) which serves to separate of ammonia gas from the other gaseous in the process. HRU is a high potential of fires due to the characteristics of hydrogen which is a highly flammable gas. In 2006, there was an explosion on pipeline in Ammonia Plant of PT Petrokimia Gresik. Therefore we need a re-analysis of the unit as a preventive measurement to avoid similar accidents in the future. The objective of this study was to analyze the risk level of HRU in Ammonia Plant area. This research was a descriptive study with an observational method. Data were obtained from interviews and observations. Data analysis was performed by using qualitative approach of Risk-Based Inspection (RBI) American Petroleum Institute (API) 581 and Failure Mode and Effect Analysis (FMEA) method to identify the risk failure each component of hydrogen pipeline. The study was conducted at the HRU by using expert judgment as a subject in the assessment of data collection. The result showed that PT. Petrokimia Gresik has not been done a risk analysis unit using RBI and identify the risk failure analysis in each unit. The research concludes that HRU risk level is medium and the high risk component failure is the pipeline body.

Keyword :

FMEA, hydrogen pipeline, risk-based inspection,


References :

American Petroleum Institute,(2000) Risk-Based Inspection Base Resource Document Washington DC : API Publication

Nazir, M,(2005) Metode Penelitian Bogor : Ghalia Indonesia

Wulansari, L.S,(2008) Perencanaan Jadwal Inspeksi Dengan Metode Risk Based Inspection (RBI) Pada Onshore Pipeline di JOB Pertamina Petrochina East Java-Tuban Surabaya : Institut Teknologi Sepuluh November Surabaya.





Archive Article

Cover Media Content

Volume : 2 / No. : 1 / Pub. : 2013-06
  1. Hubungan Karakteristik Dengan Peningkatan Ambang Pendengaran Penerbang Di Balai Kesehatan Penerbangan Jakarta
  2. Analisis Risiko Hydrogen Recovery Unit (hru) Dan Prioritas Risiko Kegagalan Komponen Pipa Gas Hidrogen Di Pt Petrokimia
  3. Risk Management Pada Pekerja Gandola Paket Iii Proyek Pengembangan Bandara Internasional Ngurah Rai-bali (ppbib), Kso Adhi-wika
  4. Tingkat Pemenuhan Safety Inspection Menurut International Safety Rating System Di Bukit Tua Development Project Pt Pal Indonesia Persero Tahun 2013
  5. Evaluasi Pelaksanaan Behavior Based Safety Pada Program Stop Dalam Membentuk Perilaku Aman Tenaga Kerja Di Pt X Tahun 2013
  6. Risk Assessment Pekerjaan Pengelasan Pada Bagian Double Bottom Pembangunan Kapal Pt X Surabaya
  7. Risk Assessment Pada Pekerjaan Welding Confined Space Di Bagian Ship Building Pt Dok Dan Perkapalan Surabaya
  8. Faktor Yang Memengaruhi Keluhan Kelelahan Pada Teknisi Gigi Di Laboratorium Gigi Surabaya
  9. Hubungan Antara Faktor Pembentuk Budaya Keselamatan Kerja Dengan Safety Behavior Di Pt Dok Dan Perkapalan Surabaya Unit Hull Constraction
  10. Analisis Pencemaran Udara (so2), Keluhan Iritasi Tenggorokan Dan Keluhan Kesehatan Iritasi Mata Pada Pedagang Makanan Di Sekitar Terminal Joyoboyo Surabaya
  11. Efektivitas Sistem Pengolahan Limbah Cair Dan Keluhan Kesehatan Pada Petugas Ipal Di Rsud Dr.m.soewandhie Surabaya
  12. Gambaran Kualitas Udara Ambien Terminal Kaitannya Dengan Gangguan Fungsi Paru Pedagang Tetap Wanita Di Terminal Joyoboyo Surabaya